Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project/Study | Description |
---|---|---|
All Bryan District Counties |
Active Transportation |
Planning and development of Active Transportation (bicycle and pedestrian facilities) in the ten-county Bryan District area. |
Brazos County | SH 6 Central BCS | Planning for improvements to SH 6 from US 190/SH 21 to SH 40/Willian D. Fitch |
Brazos County | FM 158 (William J. Bryan Parkway) |
Safety and mobility improvements for FM 158 (William J. Bryan Parkway) from SH 6 to BS 6-R (Texas Ave) |
Brazos County | BS-6R (Texas Avenue) | Construct raised medians on BS-6R from FM 2818 to SH 6. |
Brazos County | SH 6 Ramp Improvement Project |
Proposal to reverse the ramps between Boonville Road (FM 158) and SH 21 |
Brazos County | FM 60 (Raymond Stotzer Parkway) Overpass Improvement Project |
Improvements to the intersection of Raymond Stotzer Parkway (FM 60) and Harvey Mitchell Parkway (FM 2818) |
Brazos County | FM 2347 Project | Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad |
Brazos County | FM 2818 (Harvey Mitchell Parkway) Widening Project | Increase capacity from a four-lane divided roadway to a six-lane divided freeway from University Drive (FM 60) to George Bush Drive (FM 2347) |
Brazos, Grimes and Washington Counties | SH 105 Bridge Project | Replace the existing SH 105 bridges across the Navasota and Brazos Rivers and Coles Creek |
Brazos and Robertson County | SH 6 Corridor Feasibility Study | Evaluate the feasibility options to improve this corridor's safety and mobility |
Burleson County | FM 60 at the Union Pacific Bridge | Proposal to improve FM 60 at the Union Pacific Bridge in Burleson County |
Freestone County |
I-45 Fairfield |
Improve traffic flow and safety of the frontage road along I-45 in the Fairfield area |
Grimes County | SH 6 and FM 2 Intersection | Proposing improvements to the intersection of SH 6 and FM 2 |
Grimes County | SH 249 Project | Identify potential route or routes between Todd Mission and Navasota |
Leon County | I-45 at US 79 (Buffalo) Project | Improve traffic flow of US 79 at the west intersection with the I-45 frontage road in Buffalo |
Leon County | US 79 Leon County (Jewett to Buffalo) | Increase capacity from a two-lane undivided roadway to a four-lane divided roadway |
Madison County | SH 21 West Madison County | Increase capacity from a two-lane undivided roadway to a four-lane divided roadway |
Madison County | SH 21 Relief Route Madisonville |
A relief route is being studied to increase mobility |
Milam County | US 77 at FM 485 Intersection | Improve the intersection of US 77 at FM 485 |
Milam County | US 79 Rockdale Improvements | Improvements to US 79 from 0.5 mile west of FM 487 (Erie Ave) to 0.2 mile east of Highway 77 |
Robertson County | FM 50 and Union Pacific Railroad Intersection | Improve safety at the intersection of FM 50 and the Union Pacific Railroad (UPRR) in Mumford |
Robertson County | US 79 at the Little Brazos River | Replace bridge over Little Brazos River and provide improvements to US 79 in Hearn |
Walker County | I-45 Central Walker County Project |
Widen interstate to six lanes and other various improvements |
Washington County | US 290/SH 36 Interchange | Develop design concepts to improve the intersection of US 290/SH 36 |
Copyright 2019
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701