Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
Grayson County | Grayson County Tollway Study | Examines the potential extension of the Dallas North Tollway to US 75. |
Grayson County | US 75 | A project to develop long-term transportation and operational improvements on US 75 and US 82 in the Cities of Sherman and Denison in Grayson County, Texas. |
Grayson County | US 82 Safety Improvement Feasibility Study | A feasibility study to improve US 82 corridor safety and mobility. |
Hunt County | I-30/FM 2642 Bridge Replacement | A $23.2 million bridge replacement project on I-30 in Hunt County at FM 2642 that extends 3.9-miles from the Rockwall County line to FM 1565. |
Hunt County | SH 34 Feasibility Study | A feasibility study along an approximately 20-mile segment of SH 34 from I-30 to CR 2312. |
Paris | Loop 286 Improvements | Evaluation of potential short- and long-term roadway and operational improvements for Loop 286 in Paris. |
Copyright 2019
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701